Project Services

Survey Report.

  • Survey data documentation.
  • Data interpretation
  • Basic details of CP System.
  • Technical and commercial analysis.
nescon

Site Survey

  • Data collection.
  • Soil resistivity measurement.
  • Current drain test
  • Location of ground beds.
  • Location of CP stations.
  • Location of AC power sources.
  • DC Interference.
  • AC Interference.
  • Stray Current.
 
nescon

Detail Design and Engineering.

  • Scope and standards.
  • Protected objects.
  • Design philosophy and design criteria.
  • Scheme and calculations.
  • DC/AC interference mitigations.
  • Close interval potential survey.
  • Material and equipment specifications.
  • Construction and commissioning procedures.
  • Operating and maintenance instructions.
nescon
Project consultancy.  

Material and equipment supply

  • Design and supply.
  • Procurement services.
  • Follow-up delivery schedule.
  • Factory inspection and testing.

nescon

Construction and supervision.

  • Construction work.
  • Project management.
  • Follow-up construction schedule.
  • Reporting system.
nescon

Testing and commissioning

  • Equipment test.
  • Pre-commissioning.
  • Final commissioning
 

Testing and commissioning

  • Equipment test.
  • Pre-commissioning.
  • Final commissioning
 